Rail Tunnel, South East Queensland

Chase Power supplied, installed and commissioned a variety of equipment and services to a rail project comprising 4.1 kilometres of electrified track with bi-directional signalling via a 300m long tunnel, a new railway station and road bridges.

LV Distribution System

  • Comprising main switchboard and distribution boards.  The switchboard enclosure is IP42, Form 4A type tested.
  • PLC hardware, associated PLC functional design document and programming, PLC test interface and program software
  • Incident Control Panel

On Line Double Conversion UPS

  • 10kVA single phase in, single phase out UPS with AS400 card, external wrap around maintenance bypass switch and external battery banks to provide 120 minutes back-up at full load
  • Installation and Commissioning Services